Mairangi Bay Wastewater Pipeline

Share on

Since 2021, contractors have been building a new Wastewater Pump Station in Mairangi Bay as the existing station could no longer cater for new development in the area. Additional works on a new Wastewater Pipeline on Montrose Terrace has just started which will improve the flow of wastewater from the area into the new pump station.

 

Working alongside Pipeline & Civil, GHL TempFence have supplied 1.95h Temporary Fencing to create several secure compounds along Montrose Terrace. Acoustic Barriers were also used in locations to help mange noise onsite. Minimal disruptions to residents and the public is a high priority on any Infrastructure & Civil project so the use of GHL’s Acoustic Barriers proved to be the perfect solution.

 

Acoustic Barriers are specifically designed to absorb noise onsite while being extremely easy to use & install. The barriers can be easily attached to Temporary Fencing panels and removed as required. Each barrier has twelve eyelet holes to attach to the Site Fencing & Durable Velcro strips on each end of the barriers create a firm connection when installed.

 

With hundreds of Noise Control Barriers in stock ready to hire & options available to purchase, GHL Temporary Fencing can ensure your next site is fully compliant and provide the perfect Temporary Fencing solution On Time, Every Time!

Call us now on 0800TempFence or visit www.GHLTempFence.co.nz

Click here for more information on Temp Fence Hire
Click here for more information on Temp Fence Sales