NZ Blood East Tamaki

Share on

The challenge presented to GHL, was to divide the warehouse into two distinct areas: one open and operational, and the other still under construction. This required a thoughtful approach to ensure both functionality and safety during the ongoing construction phase.

Upon the initial site visit, GHL TempFence developed a comprehensive plan to meet these requirements. Their solution involved the installation of 1.8h fencing equipped with Steel Feet. The use of steel feet ensured there was no trip hazards, maintaining safety and security in an active industrial environment.

In addition to physical separation, another critical aspect addressed by the customer was the need to control of dust within the warehouse. Recognizing the importance of maintaining a clean and safe working environment, GHL installed 30% Shade Cloth coverage on the site fencing. This cloth acted as a barrier to help mitigate dust migration between the operational and construction areas. By containing dust effectively, GHL TempFence contributed to a healthier workspace and minimized potential disruptions to ongoing activities.

Call us now on 0800TempFence or visit www.GHLTempFence.co.nz

Click here for more information on Temp Fence Hire
Click here for more information on Temp Fence Sales