Auckland Airport Infrastructure

Share on

Work continues on Auckland Airports revamp where roads are set to become a six-lane showpiece with further improvements public transport and pathways. Work along George Bolt Memorial Drive and Manu Tapu Drive includes expanding lanes to six, with high-occupancy lanes added to encourage more public transport use. Additional work includes new storm water run offs, kerb lines, pedestrian path ways and lighting.

GHL Temporary Fencing are regularly called upon to work on Auckland’s biggest Infrastructure and Civil improvements. With over 10 years experience GHL TempFence have developed specific Temporary Fencing products to suit every situation on site. With the use of 1.25h Construction Barriers and 1.95h Safety Fencing, GHL successfully lined busy stretches of road to ensure minimal disruptions.

 

1.25h Construction Barriers

The barriers incorporate a highly visible orange mesh with a unique interlocking system to ensure safety along the roadside for both the public and contractors. Sitting 1.25m high with specifically designed steel feet ensures the smallest footprint possible while eliminating trip hazards and allowing traffic to flow as normal.

 Standard 1.95h Temporary Fencing

Provides a full height Temp Fencing option, designed to fully enclose a working area with GHL TempFence offering Opening Gates with Gate Keepers & Wheels at no extra charge. Bracing at regular intervals along the Temporary Fence line is also installed to ensure added stability and strength.

 

With over ten years experience working on some of the biggest Infrastructure and Civil projects, GHL TempFence can provide the perfect solution for your next site.

Call us now on 0800TempFence or visit www.GHLTempFence.co.nz

Click here for more information on Temp Fence Hire
Click here for more information on Temp Fence Sales